Project experienceArnot Mine — pit-to-plant coal hauling
Triad Mining and Logistics
Monthly project volume: 40,000 tonnes per month
Triad's Arnot Mine assignment involves moving coal from the pit to the plant at a stated monthly project volume of 40,000 tonnes. It contributes direct coal-hauling experience to the partnership's material-movement capability.
View experienceProject experienceMapochs Mine — magnetite contract mining
Triad Mining and Logistics
Monthly project volume: 60,000 tonnes per month
Triad identifies magnetite contract mining at Mapochs Mine within its project portfolio, at a stated monthly volume of 60,000 tonnes. Earlier project information associates the assignment with Evraz, formerly Highveld Steel, and records five years of operational leadership and production delivery.
View experienceProject experienceRooineke — iron-ore contract mining
Triad Mining and Logistics
Monthly project volume: 50,000 tonnes per month
Triad's project portfolio includes iron-ore contract mining at Rooineke at a stated monthly volume of 50,000 tonnes. This assignment adds iron-ore mining experience to the partnership's broader coal-hauling and magnetite-mining background.
View experienceProject experienceMminaTlou Mine — iron-ore mining
TauSadi Mining and Engineering
Stated project capacity: 50,000 tonnes per month
TauSadi's current-project schedule records an iron-ore mining assignment for General Africa Mining at MminaTlou Mine, commencing on 15 May 2026. The schedule states a five-year duration and project capacity of 50,000 tonnes per month.
View experienceProject experienceTlou Mining — materials handling
TauSadi Mining and Engineering
Stated project capacity: 140,000 tonnes per month
TauSadi's materials-handling assignment for Tlou Mining is recorded as commencing on 15 September 2026, with a stated three-year duration and project capacity of 140,000 tonnes per month.
View experienceProject experienceWonderfontein Colliery — dump removal and rehabilitation support
TauSadi Mining and Engineering
Stated contract value: R29.7 million (VAT basis not supplied)
TauSadi was awarded a dump-removal contract at Wonderfontein Colliery in March 2023. The scope covered loading, hauling and placing topsoil, soft material and blasted hard material into voids or levelled areas in accordance with the mine's rehabilitation design and scheduling. The work also included maintenance of the haul roads used for the assignment. The client reference describes a truck-and-shovel fleet supported by dozers and auxiliary equipment, including water, grading and diesel-support equipment.
View experienceProject experienceTweefontein — topsoil handling
TauSadi Mining and Engineering
TauSadi's reference information includes topsoil loading, hauling and placement at Tweefontein. The assignment contributes relevant experience in the controlled movement and placement of material within a mining environment.
View experienceProject experienceGlencore rehabilitation assignments — Zaaiwater, BMSE and Kliplaat
TauSadi Mining and Engineering
Average monthly work requirement: 150,000 cubic metres per month
TauSadi's rehabilitation experience includes dozing at Zaaiwater from November 2018 to November 2020. A subsequent Glencore reference also records work at Tweefontein Boschmans Southeast and Kliplaat in the two years preceding February 2024. The letter describes the use of D10 and D11 dozers and an average monthly dozing requirement of 150,000 cubic metres under the purchase order.
View experienceProject experienceLurco — rail-loadout commissioning and coal loading
TauSadi Mining and Engineering
TauSadi provided operational services involving the commissioning of a rail-loadout facility and the subsequent loading of thermal-coal products onto trains for the export market.