Mining operations. Material movement. Equipment support.
Three complementary partners. One coordinated approach to mining delivery.
Triad Mining and Logistics, TauSadi Mining and Engineering and Rondebult bring together experience in contract mining, materials handling, logistics and heavy-equipment support. Our proposed partnership connects these capabilities around the practical requirements of your operation—from moving material and supporting production to selecting, maintaining and supporting the equipment doing the work.
Triad Mining and LogisticsTauSadi Mining and EngineeringRondebult
Mining and logistics. Operational delivery. Equipment and technical support.
The shared proposition
Built around the way a mine operates
Mining delivery depends on connected activities. Material must move when and where it is needed. Stockpiles must support production priorities. Operators and supervisors need a clear plan. Equipment support must respond to the operating duty.
Our partnership is being structured to bring these responsibilities together. Triad contributes mining and logistics experience and client coordination. TauSadi contributes contract-mining, materials-handling and operational capability. Rondebult contributes machinery supply, maintenance, parts and technical support.
The aim is a coordinated service with clear responsibilities, practical site controls and reporting that helps clients understand the work being delivered.
Align material movement, stockpile activities, plant requirements and equipment support around the agreed production plan.
Clear responsibility
Define the client interface, operating leads, equipment responsibilities and escalation routes before work begins.
Support across the equipment lifecycle
Consider machine selection, servicing, parts and technical assistance as part of the operating solution.
Experience relevant to the work
Draw on the partners' mining, hauling, rehabilitation, processing and equipment-sector experience when shaping each assignment.
Shared experience
The experience behind the partnership
Our combined experience spans coal, magnetite, iron ore and chrome-related operations, together with rehabilitation, rail loading and equipment client relationships. Explore the work contributed by each partner and its relevance to your next requirement.
Project experience
Arnot Mine — pit-to-plant coal hauling
Triad Mining and Logistics
Monthly project volume: 40,000 tonnes per month
Triad's Arnot Mine assignment involves moving coal from the pit to the plant at a stated monthly project volume of 40,000 tonnes. It contributes direct coal-hauling experience to the partnership's material-movement capability.
Triad identifies magnetite contract mining at Mapochs Mine within its project portfolio, at a stated monthly volume of 60,000 tonnes. Earlier project information associates the assignment with Evraz, formerly Highveld Steel, and records five years of operational leadership and production delivery.
Triad's project portfolio includes iron-ore contract mining at Rooineke at a stated monthly volume of 50,000 tonnes. This assignment adds iron-ore mining experience to the partnership's broader coal-hauling and magnetite-mining background.
TauSadi's current-project schedule records an iron-ore mining assignment for General Africa Mining at MminaTlou Mine, commencing on 15 May 2026. The schedule states a five-year duration and project capacity of 50,000 tonnes per month.
Wonderfontein Colliery — dump removal and rehabilitation support
TauSadi Mining and Engineering
Stated contract value: R29.7 million (VAT basis not supplied)
TauSadi was awarded a dump-removal contract at Wonderfontein Colliery in March 2023. The scope covered loading, hauling and placing topsoil, soft material and blasted hard material into voids or levelled areas in accordance with the mine's rehabilitation design and scheduling. The work also included maintenance of the haul roads used for the assignment. The client reference describes a truck-and-shovel fleet supported by dozers and auxiliary equipment, including water, grading and diesel-support equipment.
Glencore rehabilitation assignments — Zaaiwater, BMSE and Kliplaat
TauSadi Mining and Engineering
Average monthly work requirement: 150,000 cubic metres per month
TauSadi's rehabilitation experience includes dozing at Zaaiwater from November 2018 to November 2020. A subsequent Glencore reference also records work at Tweefontein Boschmans Southeast and Kliplaat in the two years preceding February 2024. The letter describes the use of D10 and D11 dozers and an average monthly dozing requirement of 150,000 cubic metres under the purchase order.
We shape the scope around the mine's operating requirements, site conditions and commercial priorities. The participating teams, equipment arrangements and responsibilities are then defined for that assignment.
How the partnership comes together
Complementary capabilities. Defined responsibilities.
Partner
Proposed contribution
Triad Mining and Logistics
Mining and logistics experience; client interface; logistics coordination; reporting and contract administration
TauSadi Mining and Engineering
Contract-mining and materials-handling operations; production supervision; earthworks, rehabilitation and processing-related support
Rondebult
Duty-based equipment selection and supply arrangements; maintenance, parts and technical assistance
The final delivery structure is agreed for each project, including accountable leads, resources, interfaces and commercial responsibilities.
Let's discuss the work your mine needs to deliver
Whether your requirement involves material movement, contract mining, rehabilitation or equipment support, start with a conversation about the operating challenge. We will work with you to define the scope and assess how the partners' capabilities can be brought together.